化工厂建设期作业风险定量研究
Quantitative Study of Operational Risk During the Construction Period of Chemical Plant
摘要
Abstract
In order to manage and control the risk during the construction period in the chemical plant, the risk characteristics have been analyzed, in view of mutual accumulation of construction operational risk in time and space, establishing a dynamic and accumulative operational risk model based on the LEC model. The model is applied to calculate the static and dynamic risk score of each unit in a chemical plant during the typical construction period, and determine the risk accumulation area and score simultaneously. The accumulative risk distribution map was drawn, which can be an effective tool in view of the risk control and management of main parts. According to the model the risk management system was design on GIS, so that the ability of preventing the accidents and safety management ware get further improved.关键词
化工项目/建设期/作业条件危险评价法/动态风险/叠加原理Key words
chemical project/ construction period/ LEC/ dynamic risk/ accumulative principle分类
资源环境引用本文复制引用
王凯全,刘华月..化工厂建设期作业风险定量研究[J].常州大学学报(自然科学版),2012,24(2):35-39,5.基金项目
国家"十二五"科技支撑计划资助(2011BAK03B00) (2011BAK03B00)