| 注册
首页|期刊导航|路基工程|大瑞铁路高黎贡山越岭段地质灾害工程分区评价

大瑞铁路高黎贡山越岭段地质灾害工程分区评价

寇川 赵志明

路基工程Issue(4):20-22,3.
路基工程Issue(4):20-22,3.

大瑞铁路高黎贡山越岭段地质灾害工程分区评价

Assessment on Engineering Division of Geological Hazard in Crossing-mountain Area of Gaoligong Mountain at Dali-Ruili Railway

寇川 1赵志明2

作者信息

  • 1. 中铁二院工程集团有限责任公司,成都610031
  • 2. 西南交通大学地球科学与环境工程学院,成都610031
  • 折叠

摘要

Abstract

In the area where Dali-Ruili Railway crosses the Gaoligong Mountain, the track scheme gets under the geological factors mainly due to the complex geological conditions herein. Through the detailed analysis on the type, scale and influencing factors of geological hazard in this crossing-mountain area, the mathematic model for the engineering division of geological hazard is established by means of analytic hierarchy process, dividing this area into I safety zone, II basic safety zone, III less dangerous zone and IV dangerous zone. The research result is the basis of route selection and design of Dali-Ruili Railway.

关键词

地质灾害/工程分区/层次分析法

Key words

geological hazard/engineering division/analytic hierarchy process

分类

交通工程

引用本文复制引用

寇川,赵志明..大瑞铁路高黎贡山越岭段地质灾害工程分区评价[J].路基工程,2012,(4):20-22,3.

基金项目

铁道部项目:强震诱发次生地质灾害预测及工程分区研究 ()

路基工程

1003-8825

访问量0
|
下载量0
段落导航相关论文