摘要
Abstract
Subgrade filling of deep-water section in reservoir area is affected by hydrological, topographical, geological and construction conditions, which is a problem in subgrade design and construction and also a key factor in overall road engineering. Through the practice in design of subgrade filling of deep-water section in reservoir area, the design and construction method thereof are proposed. It has proved that the overall stability of this subgrade is good since the road was opened to traffic.关键词
库区/深水路基/设计施工Key words
reservoir area/deep-water subgrade/design and construction分类
交通工程