| 注册
首页|期刊导航|工矿自动化|选煤厂铁路装车自动减载系统设计与应用

选煤厂铁路装车自动减载系统设计与应用

王冬 王东才 范荣广

工矿自动化2012,Vol.38Issue(8):89-92,4.
工矿自动化2012,Vol.38Issue(8):89-92,4.

选煤厂铁路装车自动减载系统设计与应用

Design and Application of Automatic Unloading System of Railway Loading for Coal Preparation Plant

王冬 1王东才 1范荣广1

作者信息

  • 1. 兖矿集团南屯煤矿选煤厂,山东邹城 273515
  • 折叠

摘要

Abstract

In view of problem that loading accuracy and loading quality could not be ensured because of serious overloading existed in loading system of Coal Preparation Plant of Nantun Coal Mine, an automatic unloading system was designed, design of hardware and software of the system was introduced. The automatic unloading system is added a coal unloading unit. When train passed through metering scale, the system can get metering information of train by communication with original automatic loading coal system. If the train is overloaded, the coal unloading unit would go down to unload coal. A metering system is installed on coal back belt. The system realizes automation of overloading and unloading of train.

关键词

选煤厂/铁路装车/定量装载/超载/自动减载/取煤机构

Key words

coal preparation plant, railway loading, quantitative loading, overload, automatic unloading, coal unloading unit

分类

矿业与冶金

引用本文复制引用

王冬,王东才,范荣广..选煤厂铁路装车自动减载系统设计与应用[J].工矿自动化,2012,38(8):89-92,4.

工矿自动化

OA北大核心CSTPCD

1671-251X

访问量0
|
下载量0
段落导航相关论文