| 注册
首页|期刊导航|泥沙研究|瀑布沟水电站截流水流数学模型研究

瀑布沟水电站截流水流数学模型研究

肖桃李 魏文俊

泥沙研究Issue(2):47-53,7.
泥沙研究Issue(2):47-53,7.

瀑布沟水电站截流水流数学模型研究

Research of river closure flow mathematical model for Pubugou Hydropower Station

肖桃李 1魏文俊2

作者信息

  • 1. 长江大学城市建设学院,湖北荆州434023
  • 2. 武汉理工大学道路桥梁与结构工程重点实验室,湖北武汉430070
  • 折叠

摘要

Abstract

During river closure, the flow boundary of closure gap changes with the fold of closure dike, which brings a great difficulty to hydraulic calculation of construction design. In this paper the research area is a 750m long river section from the diversion tunnel entrance to the Pubugou Hydropower Station dam axis and the research tool is a two-dimensional flow mathematic model. When the closure design discharge is 1 000m3 /s, different hydraulic parameters with various closure gap widths are obtained. These parameters include average cross-sectional flow velocity, average cross-sectional water level, average vertical flow velocity, and the planar distribution of water level and depth, etc. The consequences of the physical model test results show that the average flow velocity in the closure gap, the water fall upstream and downstream the closure gap, the water level and depth near the closure gap are close with the experimental results.

关键词

水流数学模型/截流/龙口/瀑布沟水电站

Key words

flow mathematical model/ river closure/ closure gap/ Pubugou Hydropower Station

分类

建筑与水利

引用本文复制引用

肖桃李,魏文俊..瀑布沟水电站截流水流数学模型研究[J].泥沙研究,2012,(2):47-53,7.

泥沙研究

OA北大核心CSCDCSTPCD

0468-155X

访问量0
|
下载量0
段落导航相关论文