| 注册
首页|期刊导航|宁夏电力|风电自动发电控制策略可行性分析

风电自动发电控制策略可行性分析

程彩艳 施佳锋 沈燕

宁夏电力Issue(3):1-4,4.
宁夏电力Issue(3):1-4,4.

风电自动发电控制策略可行性分析

Feasibility analysis of wind power automatic generation control strategy

程彩艳 1施佳锋 1沈燕2

作者信息

  • 1. 宁夏电力公司,宁夏银川750001
  • 2. 华能宁夏能源有限公司,宁夏银川750001
  • 折叠

摘要

Abstract

In order to conquer many adverse factors when the operation of the large scale wind power generation connected with the power network, on the basis of the active power conLtrol technology for traditional water and coal-fired generating sets, considering the operation characteristic of wind power generation, analyzes various wind power generation control strategy such as the planning curve track and the time-limit control, successfully realizes the first active power closed-loop control of wind pow- er generation connected with the power network in Ningxia. the research result shows that this wind power generation control strategy has strong feasibility, which can provide key technology support for power network admitting large scale wind power generation.

关键词

风力发电/自动发电控制/闭环控制/区域控制偏差

Key words

wind power generation/automatic power generation control/closed--loop control/area control error

分类

信息技术与安全科学

引用本文复制引用

程彩艳,施佳锋,沈燕..风电自动发电控制策略可行性分析[J].宁夏电力,2012,(3):1-4,4.

基金项目

宁夏回族自治区新能源发电产业资助项目[宁财(建)发(2010)1313号] ()

宁夏电力

1672-3643

访问量0
|
下载量0
段落导航相关论文