| 注册
首页|期刊导航|水力发电学报|高拱坝真实工作性态仿真的理论与方法

高拱坝真实工作性态仿真的理论与方法

张国新 刘毅 朱伯芳 王仁坤

水力发电学报2012,Vol.31Issue(4):167-174,8.
水力发电学报2012,Vol.31Issue(4):167-174,8.

高拱坝真实工作性态仿真的理论与方法

Theory and method on simulation of actual working performance of high arch dams

张国新 1刘毅 1朱伯芳 1王仁坤2

作者信息

  • 1. 中国水利水电科学研究院流域水循环模拟与调控国家重点实验室,北京100038
  • 2. 中国水电工程顾问集团成都勘测设计研究院,成都610072
  • 折叠

摘要

Abstract

Safety of super-high arch dams is a crucial subject in hydraulic structure design, and one of its key issues is how to evaluate the actual working performance under the existing loading conditions. This paper presents a comprehensive discussion on the theories and methods of this issue developed recent years, from three aspects of actual loading, analysis methods and techniques, and parameters and criteria, so as to formulate a general concept of high arch dam simulation for the design and construction of high arch dams.

关键词

水工结构/真实工作性态/全过程仿真/高拱坝

Key words

hydraulic structures/actual working performance/whole course simulation/high arch dam

分类

建筑与水利

引用本文复制引用

张国新,刘毅,朱伯芳,王仁坤..高拱坝真实工作性态仿真的理论与方法[J].水力发电学报,2012,31(4):167-174,8.

基金项目

国家科技支撑计划(2008BAB29805),国家自然科学基金(50539020,50909105),水利部行业公益科研专项(200801007),中国水科院科研专项 ()

水力发电学报

OA北大核心CSCDCSTPCD

1003-1243

访问量0
|
下载量0
段落导航相关论文