水利水电技术2012,Vol.43Issue(7):24-27,4.
北京通州新城建设中再生水利用规划及其实施
Planning and implementation of recycled water use in construction of Tongzhou New Town in Beijing
芦艳平1
作者信息
- 1. 北京泽通水务建设有限公司,北京101100
- 折叠
摘要
Abstract
Tongzhou New Town is one of 11 new urban areas planned in Beijing, and it is the key node in the eastern development zone of the city. As the sewage pipeline networks are not completed yet and a part of untreated sewage is directly discharged into rivers directly, the water environment therein is heavily polluted; which becomes an important barrage to obstruct the local health economic development and the enhancement of the people' s living standard. In accordance with the general urban planning concerned, a completed drainage system must be formed in the new town, i. e. diverting the sewage into recycled water plant for treatment and re-use through the layout of sewage pipeline system and the construction of recycled water plant- The planning and implementation of the sewage treatment for Tongzhou New Town is introduced herein, and then the more advanced MBB treatment technology of Hedong Water Recycling Plant under construction is described as welL关键词
通州新城/污水处理/再生水利用/规划/实施/北京市Key words
Tongzhou New Town/ sewage treatment/ recycled water use/ planning/ implementation/ Beijing分类
环境科学引用本文复制引用
芦艳平..北京通州新城建设中再生水利用规划及其实施[J].水利水电技术,2012,43(7):24-27,4.