武广高速铁路桥上铺设无砟轨道关键技术研究

王森荣

铁道标准设计Issue(7):1-4,4.
铁道标准设计Issue(7):1-4,4.

武广高速铁路桥上铺设无砟轨道关键技术研究

Study on Key Technology of Paving the Ballastless Track on Bridge in Wuhan-Guangzhou High-Speed Railway

王森荣1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司线站处,武汉430063
  • 折叠

摘要

Abstract

The purpose of this study is to solve a series of technical problems when paving the ballastless track on long-span bridge of Wuhan-Guangzhou High-speed Railway, such as passing through large-scale girder's juncture, installing the rail expansion joints because of the overlarge gird-end rotation and displacement and overlarge temperature-span, the stability of gird-end track slab, laying the turnout on bridge, etc. Through theoretical calculation and analysis based on operation condition and the most adverse factors, several key technical problems of paving the ballastless track on the long-span bridge were solved in Wuhan - Guangzhou High-speed Railway, that are: paving the ballastless tracks on the bridge with the longest span of 168m, paving the ballastless tracks on the bridge with steel box tied-arch, and paving the ballastless tracks on the bridge's turnout zone.

关键词

武广高速铁路/无砟轨道/桥梁/关键技术

Key words

Wuhan-Guangzhou High-speed Railway/ ballastless track/ bridge/ key technology

分类

交通工程

引用本文复制引用

王森荣..武广高速铁路桥上铺设无砟轨道关键技术研究[J].铁道标准设计,2012,(7):1-4,4.

铁道标准设计

OA北大核心CSTPCD

1004-2954

访问量0
|
下载量0
段落导航相关论文