铁道标准设计Issue(7):91-93,97,4.
预应力混凝土箱梁支架钢绞线法高位落梁施工技术
Construction Technology on Prestressed Concrete Box Girder's Placement from High Position by Method of Support Frame plus Steel Strand
彭波1
作者信息
- 1. 中铁四局集团第二工程有限公司,江苏苏州236024
- 折叠
摘要
Abstract
The paper's example is located at the fourth span of No. 2 Port Bridge in the extension project of Hangzhou East Railway Station of reconstructed Hangzhou Railway Terminal. The construction of the placement of box girder from high position is introduced in this paper. The paper introduces emphatically the scheme comparison about the construction of girder placement from high position, the structure design of girder-placement system, construction technology and safety methods, especially using the method of support frame plus steel strand and using the self-locking jack technology. As a result, with these construction technologies, the problem that the prestressed concrete box girder should be dropped down safely, stably, quickly and accurately from high position was solved well. The paper can provide a good reference for the construction of the similar projects too.关键词
预应力混凝土/箱形梁/高位落梁/支架钢绞线法/施工Key words
prestressed concrete/ box girder/ girder placement from high position/ method of support frame plus steel strand/ construction分类
交通工程引用本文复制引用
彭波..预应力混凝土箱梁支架钢绞线法高位落梁施工技术[J].铁道标准设计,2012,(7):91-93,97,4.