铀矿冶2012,Vol.31Issue(3):158-161,4.
广西某铀矿山露天采场及废石场的退役治理
Close-out of open pit and waste rock piles of a uranium mine in Guangxi province of China
徐乐昌 1张钊 2张国甫 3刘敏4
作者信息
- 1. 核工业北京化工冶金研究院,北京101149
- 2. 广西南宁新原核工业有限责任公司,广西大新530001
- 3. 中核集团地矿事业部,北京100013
- 4. 中国核科技信息与经济研究院,北京100048
- 折叠
摘要
Abstract
Close-out of projects of a mine in Guangxi province of China includes open pit, east and west waste rock piles, ore transfer station, industrial fields, buildings, ore transporting road, and equipment and conduits. The following remediation limits are introduced: environment penetrating radiation dose rate and 222Rn flux of open pit and waste rock piles, 226Ra specific activity of soil and individual dose. Remediation objective and programme are discussed in details. Remediation effects are evaluated.关键词
铀/露天采场/废石场/退役Key words
uranium/ open pit/ waste pile/ remediation分类
能源科技引用本文复制引用
徐乐昌,张钊,张国甫,刘敏..广西某铀矿山露天采场及废石场的退役治理[J].铀矿冶,2012,31(3):158-161,4.