油气地质与采收率2012,Vol.19Issue(4):56-58,3.
稠油油藏多轮次蒸汽吞吐防砂后产能预测模型
New productivity prediction model Tor sand control wells by cyclic steam stimulation
摘要
Abstract
There are many productivity prediction models for heavy oil wells with cyclic steam stimulation, but these models have little consideration on effects of sand control measures for the productivity, however, sand control measures are necessary for heavy oil stimulation, which result in some errors in calculation of the productivity. This paper presents a new productivity two zone model which considers the interaction of steam stimulation and sand control, and this model also combines the gravity override effect and the rheological behavior of heavy oil, then, it gives an actual example. Comparing with conventional models, the heating radius calculated through new model are greater and the calculation error is approximately 5% , which proves its validity. Based on negative power exponent of the heating radius hypothesis, the new model should not consider the heating area, shape and the influence of the reservoir thickness. The computing workload for new model is small and it is easy to use, which can provide plan for the productivity prediction for sand control well with thermal recovery.关键词
蒸汽吞吐/加热半径/防砂/表皮因子/产能预测Key words
cyclic steam stimulation/ heating radius/ sand control/ skin factor/ productivity prediction分类
能源科技引用本文复制引用
时贤,李兆敏,刘成文,李宾飞,李鹏华..稠油油藏多轮次蒸汽吞吐防砂后产能预测模型[J].油气地质与采收率,2012,19(4):56-58,3.基金项目
国家高科技研究发展计划("863"计划)"注气辅助SAGD技术研究与现场试验"(2009AA06Z205). ("863"计划)