铸造2012,Vol.61Issue(5):480-484,5.
七档自动变速箱前壳体压铸工艺优化
Optimization of the Die Casting Process of Seven-Gear Auto Transmission Front Case
摘要
Abstract
After a detailed comparison of the mold filling simulation results of three different runner systems in the die design of a seven-gear auto transmission case casting, the optimal scheme of the runner system was obtained. Through the evaluation of the solidification simulation results on locations of hot spots and shrinkage porosities, the cooling design for the die was determined. The optimal die design of the casting was successfully used in practical application and the results for air-leakage test and the appearance observation of the castings show that numerical simulation could be used as a tool for the die design of large and complex die design and this optimal die design of the seven-gear auto transmission case could be used as a reference for the die design of similar products.关键词
数值模拟/高压铸造/变速箱壳体/工艺优化Key words
numerical simulation/ high pressure die casting process/ transmission case/ process optimization分类
矿业与冶金引用本文复制引用
张伟,方健儒,熊守美..七档自动变速箱前壳体压铸工艺优化[J].铸造,2012,61(5):480-484,5.基金项目
“高档数控机床与基础制造装备”科技重大专项(2011ZX04001-071,2011ZX04014-052) (2011ZX04001-071,2011ZX04014-052)
国家科技支撑计划项目(2011BAE21B02). (2011BAE21B02)