| 注册
首页|期刊导航|地质与勘探|热熔法井壁加固技术研究

热熔法井壁加固技术研究

卢春华 吴翔 王强

地质与勘探2012,Vol.48Issue(5):1034-1038,5.
地质与勘探2012,Vol.48Issue(5):1034-1038,5.

热熔法井壁加固技术研究

Study on Hot-Melt Sidewall Strengthening Technology

卢春华 1吴翔 1王强1

作者信息

  • 1. 中国地质大学工程学院,湖北武汉430074
  • 折叠

摘要

Abstract

Instability of sidewall is a common problem existing in the drilling process which puzzled the drilling industry. The traditional way of casing can isolate instability sidewall reliably. However, it has some drawbacks such as reduction of hole-diameter, time and power consumption, increase of cost and work duration, and even drilling accidents. The project team devoted to research a kind of simple, reliable, fast and effective way for supporting hole well, which will do not reduce hole-diameter at the same time. This new method melts the granular hot melting material, and squeezes it into the sidewall cracks to attain the purpose of reinforcing sidewall. This paper elaborates the design of the heating element, hot melt materials selection and indoor artificial simulation of sidewall reinforcement test. The result indicates that this new method is feasible and able to attain obvious strengthening side- wall effects.

关键词

热熔法/井壁加固/热熔材料

Key words

hot-inch method/sidewall strengthening/hot-melt material

分类

天文与地球科学

引用本文复制引用

卢春华,吴翔,王强..热熔法井壁加固技术研究[J].地质与勘探,2012,48(5):1034-1038,5.

基金项目

中央高校基本科研业务费专项资金项目 ()

岩土钻掘与防护教育部工程研究中心开放研究基金(编号201103). ()

地质与勘探

OA北大核心CSCDCSTPCD

0495-5331

访问量4
|
下载量0
段落导航相关论文