路基工程Issue(5):180-182,3.
兰新铁路挡风墙的设计与施工
Design and Construction of Wind-break Wall for Lanzhou-Xinjiang Railway
王学楷1
作者信息
- 1. 中铁二局股份公司稽查大队,成都610032
- 折叠
摘要
Abstract
Lanzhou-Xinjiang Railway is subject to wind blast all the year round and the train service is always forced to be suspended. The engineering solution for train overturning and speed raising is proposed according to the wind blast; moreover, the design basis, the stability calculation and the height determination of the wind-break wall are described; and the construction technology, effect analysis and improvement measures for the wall with three types of structure are set out herein as well.关键词
风害/挡风墙/设计/施工Key words
wind blast/wind-break wall/design/construction分类
交通工程引用本文复制引用
王学楷..兰新铁路挡风墙的设计与施工[J].路基工程,2012,(5):180-182,3.