煤矿安全2012,Vol.43Issue(10):188-191,4.
煤矿水体下安全开采可行性分析
Feasibility Analysis of Coal Mine Safety Mining Under Water Body
摘要
Abstract
Aiming at the problem of mining No.3 coal under plash caused by surface subsidence of a coal mine in Shandong,the paper analyzes the amount of surface subsidence caused by coal mining.The development height of "two belts" in No.3 coal mine is measured by using" double end water blocking device" technology.Compared with the theoretical values and UDEC simulation values,the height of water flowing fractured zone is determined as 47.75 m,the safety height of waterproof coal pillar in No.3 coal mine is 70 m.Using FLAC software,the paper simulates the water threat degrees of different gas faults in the remaining different coal pillar widths.The results show that the coal mine can be carried out safety mining under water area.关键词
塌陷坑/裂隙带高度/覆岩破坏/数值模拟Key words
collapse pit/height of fissure zone/overburden failure/numerical simulation分类
矿业与冶金引用本文复制引用
姜敏,栾元重,任耀,班训广,刘阳..煤矿水体下安全开采可行性分析[J].煤矿安全,2012,43(10):188-191,4.基金项目
山东省自然科学基金资助项目 ()
山东科技大学研究生创新基金资助项目 ()