| 注册
首页|期刊导航|煤矿安全|顶板瓦斯尾巷采动变形规律及控制技术

顶板瓦斯尾巷采动变形规律及控制技术

王继林 陈芳 屠洪盛

煤矿安全2012,Vol.43Issue(11):17-19,3.
煤矿安全2012,Vol.43Issue(11):17-19,3.

顶板瓦斯尾巷采动变形规律及控制技术

Mining Deformation Laws and Control Technology of Roof Gas Tail Roadway

王继林 1陈芳 2屠洪盛2

作者信息

  • 1. 中国矿业大学(北京)资源与安全工程学院,北京100083 潞安环保能源开发股份公司五阳煤矿,山西长治046205
  • 2. 中国矿业大学矿业工程学院,江苏徐州221116
  • 折叠

摘要

Abstract

In order to study the deformation failure laws of the roof gas tail roadway,combining with the geological conditions of the 7605 high gas fully mechanized caving face in Wuyang mine,the physical simulation and FLAC3D numerical simulation were adopted to analyze the characteristics of the stress distribution and the plastical development in the surrounding rock of the roof gas tail roadway and mining roadway.The results indicated that after the face mining sufficiently,a range of 10~16 m stress composited concentration zone was developed in the front of the coal rib,and the maximum concentration factor of the vertical stress is approximately 2.72.with the employment of gas tail roadway control technology,the field trial has obtained good results.

关键词

综放工作面/瓦斯尾巷/相似模拟/控制技术

Key words

fully mechanized caving face/gas tail roadway/analog simulation/control technology

分类

矿业与冶金

引用本文复制引用

王继林,陈芳,屠洪盛..顶板瓦斯尾巷采动变形规律及控制技术[J].煤矿安全,2012,43(11):17-19,3.

煤矿安全

OA北大核心

1003-496X

访问量0
|
下载量0
段落导航相关论文