泥沙研究Issue(4):58-62,5.
洋山港南北汊道水体和悬沙输运变化
Variation of water and suspended sediment transport in north and south inlets of Yangshan Harbor
摘要
Abstract
Inlet closure is one of the layouts of the Yangshan Harbor Project, the fundamental engineering for port building, and its completion is a primary contribution to hydrodynamic and sea bed accretion/erosion change. So far, the inlets between Kezhushan Island and Xiaoyangshan Island in north, between Shuanglians-han Island and Dashantang Island and between Dashantang Island and Dayangshan Island in south remain open. Whether closing these inlets has ever been a hot issue. The paper analyses the yearly variation of water and suspended sediment transport based on flux analysis. The result shows that it is essential to remain the inlet between Kezhushan Island and Xiaoyangshan Island open because the net suspended sediment transport out of the harbor per unit width in normal direction increases with year.关键词
水沙长期输运速度/汊道/洋山港Key words
residual transport velocity/ water and suspended sediment/ inlet/ Yangshan Harbor 62分类
建筑与水利引用本文复制引用
英晓明,孔亚珍..洋山港南北汊道水体和悬沙输运变化[J].泥沙研究,2012,(4):58-62,5.基金项目
海洋公益性行业科研专项经费资助(200905001-9) (200905001-9)