水力发电2012,Vol.38Issue(9):5-8,4.
糯扎渡水电站绿色水电工程建设规划和实践
Planning and Practice on Green Hydropower of Nuozhadu Project
摘要
Abstract
The green hydropower planning of Nuozhadu Hydropower Station Project is earned out from three aspects of cco-environmental protection and rehabililation, environmental protection management and key technology, of researches. The implication, concept, indicators and main contents of green hydropower planning of Nuozhadu project are introduced herein, and ihe implementation of green hydropower planning during the construction of Nuozhadu project is also briefly illustrated. The practice shows that the green hydropower planning and its implementation can support the sustainable development of Nuozhadu project and other hydropower utilization in Lancang River basin, and meanwhile, provide a helpful reference for the depth of ecological and environmental protection in Chinese hydropower industry.关键词
绿色水电/规划/实践/糯扎渡水电站Key words
green hydropower/ planning/ practice/ Nuozhadu Hydropower Station分类
建筑与水利引用本文复制引用
袁湘华..糯扎渡水电站绿色水电工程建设规划和实践[J].水力发电,2012,38(9):5-8,4.基金项目
国家科技支撑计划项目(2011BAC09B07) (2011BAC09B07)