The hydraulic characteristics, flow-induced vibration and released water temperature nf stoplog gate in multi-level intake structure of Nuozhadu Hydropower Station are studied by numerical analysis and model tests. The results demonstrate that the application of stoplog gate in multi-level intake is feasible and can effectively improve the temperature of released water. The multi-level intake is one of effective measures to promote the harmonious development of hydropower project and aquatic eeo-environment.

关键词

叠梁闸门/分层取水/进水口/下泄水温/流激振动/糯扎渡水电站

Key words

stoplog gate/ multi-level intake/ intake/ released water temperature/ flow-induced vibration/ Nuozhadu Hydropower Station