水力发电2012,Vol.38Issue(9):65-67,74,4.
糯扎渡水电站右岸泄洪洞混凝土施工关键技术
Key Technologies of Concrete Construction for Right-bank Spillway Tunnel in Nuozhadu Hydropower Station
张耀威 1柴喜洲 1武俊锋 1薛香臣1
作者信息
- 1. 中国人民武装警察部队水电第一总队,广西 南宁 530028
- 折叠
摘要
Abstract
The concrete construction of large-diameter circular pressure, section and large-size horseshoe-shaped non-pressure section of the right-bank spillway tunnel in Nuozhadu Hyrlropower Slation are described and analyzed. The key concrete construction technologies are summed up herein to provide references for the concrete construction of hydraulic tunnels with extra large size, large discharge, high flow rate and complex structure in the future.关键词
混凝土/施工工艺/平整度/温控/糯扎渡水电站Key words
concrete/ construction technology/ flatness/ lemperalure control: Nuozhadu Hydropower Station分类
建筑与水利引用本文复制引用
张耀威,柴喜洲,武俊锋,薛香臣..糯扎渡水电站右岸泄洪洞混凝土施工关键技术[J].水力发电,2012,38(9):65-67,74,4.