糯扎渡水电站水管式沉降仪安装试验研究

韩建东 张琛

水力发电2012,Vol.38Issue(9):96-99,4.
水力发电2012,Vol.38Issue(9):96-99,4.

糯扎渡水电站水管式沉降仪安装试验研究

Experimental Research on the Installation of Pipe-type Settlement Gauge in Nuozhadu Hydropower Station

韩建东 1张琛1

作者信息

  • 1. 中国水利水电建设工程咨询西北公司,陕西 西安 710075
  • 折叠

摘要

Abstract

The site layout, required materials, installation and dam material hackfill are experimentally researched to simulate the installation conditions of pipe-lube settlement gauge in Nuozhadu high core rockfill dam. The experiment is in accordance with the requirements of monitoring standards and related technologies and considers the calculation and correction principles of gauge's measured value. The experimental data show that the maximum settllements of two measuring points are 145 mm and 37 mm respectively, and the measured values are stable. The gauge has a good applicability for Nuozhadu Dam.

关键词

水管式沉降仪/安装试验/模拟/糯扎渡水电站

Key words

pipe-type settlement gauge/ experimental research/ simulation/ Nuozhadu Hydropower Station