| 注册
首页|期刊导航|水力发电学报|锦屏一级水电站地下厂房下游拱围岩变形开裂破坏成因分析与加固措施研究

锦屏一级水电站地下厂房下游拱围岩变形开裂破坏成因分析与加固措施研究

侯东奇 廖成刚 冯梅 幸享林 臧海燕

水力发电学报2012,Vol.31Issue(5):229-235,7.
水力发电学报2012,Vol.31Issue(5):229-235,7.

锦屏一级水电站地下厂房下游拱围岩变形开裂破坏成因分析与加固措施研究

Study on deformation and damage causes and reinforcement measures of rock mass surrounding the downstream arch of underground powerhouse for Jinping-I hydropower

侯东奇 1廖成刚 1冯梅 1幸享林 1臧海燕1

作者信息

  • 1. 中国水电顾问集团成都勘测设计研究院,成都610072
  • 折叠

摘要

Abstract

Rock-mass stability of underground powerhouse caverns is a key technical problem. This paper discusses the development of deformation and damages of the rock-mass surrounding the downstream arch of the underground powerhouse and its complicated poor geological condition. An analysis on this phenomenon is presented in terms of its geological properties and numerical calculations. Reinforcement measures are suggested and their effects are evaluated by using safety monitoring data.

关键词

岩石力学/变形破坏/有限单元法/地下厂房围岩/工程加固

Key words

geomechanics/deformation damages/finite element method/rock-mass of undergroundpowerhouse/reinforcement measure

分类

建筑与水利

引用本文复制引用

侯东奇,廖成刚,冯梅,幸享林,臧海燕..锦屏一级水电站地下厂房下游拱围岩变形开裂破坏成因分析与加固措施研究[J].水力发电学报,2012,31(5):229-235,7.

水力发电学报

OA北大核心CSCDCSTPCD

1003-1243

访问量4
|
下载量0
段落导航相关论文