水利水电技术2012,Vol.43Issue(9):1-3,7,4.
引大济湟工程受水区水量分配的重新调整与优化研究
Study on optimization and readjustment of water allocation for reception basin of Datonghe River-to-Huangshuihe River Water Diversion Project
摘要
Abstract
Under the consideration of the restriction conditions such as the available water supply, economic-social water demand, ecological water demand, etc., a regional multi-objective model of water resources optimal allocation is established, and then the general layout of the water allocation for the reception basin of Datonghe River-to-Huangshuihe River Water Diversion Project is readjusted and optimized based on the solution with GAMS (General Algebraic Modeling System). Furthermore, the investment scale of the project is estimated, so as to support the overall building of the moderately prosperous society and the realization of the great-leap-forward development of the eastern urban group therein along the mainstream of Huangshuihe River, and then provide the safety guarantee of the water supply for the new development strategy of the urbanization, industrialization and agricultural industrialization along the river, furthermore, fully exert and enhance the comprehensive benefits of the socio-econo-my and the eco-environment from Datonghe River-to-Huangshuihe River Water Diversion Project.关键词
引大济湟/水量分配/受水区/水资源优化配置Key words
Datonghe River-to-Huangshuihe River Water Diversion Project/ water allocation/ reception basin/ water resources optimal allocation分类
建筑与水利引用本文复制引用
沙金霞,谢新民,张守平,鹿海员..引大济湟工程受水区水量分配的重新调整与优化研究[J].水利水电技术,2012,43(9):1-3,7,4.基金项目
水利部公益性行业科研专项(201101034-01). (201101034-01)