水土保持研究2012,Vol.19Issue(5):275-280,6.
新疆维吾尔自治区水土保持补偿费收费方法和标准
Soil and Water Conservation Methods and Standards of Compensation Charge in Xinjiang Uygur Autonomous Region
摘要
Abstract
In the construction and production process which caused soil and water conservation facility damage or reduction, enterprises and institutions should be compensated. The function of soil and water conservation facilities could continue to be effective, and the compensation charges standards on soil and water conserva- tion facilities should be treated differently in terms of the time factor. Charging method and standard is a core part of compensation charges of Soil and Water Conservation Policy, its rationality and effectiveness are di- rectly related to the feasibility of the specific implementation of the policy. Preliminary study on charging the Soil and Water Conservation compensation methods and standards of Xinjiang Uygur Autonomous Region, put forward collection targets, charging methods and compensation standards of Soil and Water Conservation facilities compensation in order to provide a theoretical basis for Soil and Water Conservation compensation classification pilot, the gradual promotion as soon as possible for establishment of soil and water conservation ecological compensation system.关键词
水土保持/收费方法/补偿费标准/新疆维吾尔自治区Key words
soil and water conservation/charging method/compensation standards/Xiniiang Uygur Autono-mous Region分类
农业科技引用本文复制引用
高照良,吴晹,郭亚军..新疆维吾尔自治区水土保持补偿费收费方法和标准[J].水土保持研究,2012,19(5):275-280,6.基金项目
新疆维尔族自治区水利厅科研计划重点项目“新疆维尔族自治区能源开发水土保持补偿机制研究” ()