深圳大学学报(理工版)2012,Vol.29Issue(5):466-470,5.DOI:10.3724/SP.J.1249.2012.05466
主线机动容量合理分配的匝道协同控制
Reasonable allocation of flexible capacity for ramp coordinated metering
摘要
Abstract
The idea of flexible capacity and the problem of its reasonable allocation for ramp coordinated metering are put forth in consideration of the traffic characteristics of periphery road. The optimal coordinated control mete-ring of multi-ramps is discussed , and the efficiency and equity of flexible capacity allocation is analyzed by modif-ying the length of control cycle. A modified ramp latency model is posed using the method of queuing theory, and the related redundancy latency cycle amount is designed to evaluate the consequence quantitatively. With in-situ traffic flow data, two scenarios of no-control and coordinated with different flexible capacity using strategies are compared. Results demonstrate the advantages of the new method.关键词
交通控制/高速公路/匝道协同/机动容量/最优控制/冗余等待周期数Key words
traffic control/ freeway/ ramp coordination/ flexible capacity/ optimal control/ redundancy latency cycle amount分类
自科综合引用本文复制引用
李健,贾元华,敖谷昌..主线机动容量合理分配的匝道协同控制[J].深圳大学学报(理工版),2012,29(5):466-470,5.基金项目
国家高技术研究发展计划资助项目(2007AA11Z213) (2007AA11Z213)