西平铁路(54+3×90+54)m刚构-连续梁设计

杨正华

铁道标准设计Issue(9):64-67,4.
铁道标准设计Issue(9):64-67,4.

西平铁路(54+3×90+54)m刚构-连续梁设计

Design of (54+3×90+54)-m Rigid-Frame Continuous Girder Bridge on Xi'an-Pingliang Railway

杨正华1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司,西安710043
  • 折叠

摘要

Abstract

The main bridge of Bridge No. 2 at Mogu River is rigid - frame continuous girder. The maximum pier is about 70 m in height. By means of finite element program, the paper introduces the main structural parameters, analysis methods and other items. The results show that all items can meet design requirements.

关键词

铁路桥/刚构-连续梁/结构设计/计算模型

Key words

railway bridge/rigid-frame continuous girder/structural design/calculation model