水资源与水工程学报2012,Vol.23Issue(4):138-140,144,4.
渭河“11·9”洪水特性及其河道影响分析
Analysiys of flood characteristics in September 2011 and its impact on the channel of Weihe river
摘要
Abstract
Through the analysis for the autumn rain and flood process in September 2011 in the middle and down stream of Weihe River, the results showed that the "11.9 " flood in the down stream of Weihe River appeared some characteristics as high flood level, longer duration, peak flood reducing along the river and slow evolution between Iintong and Huaxian. From the aspects of sediment scouring and silting in the river channel, the changes of river regime and flood disasters, the paper discussed the impacts of flood on river channel in the down stream of Weihe River and put forward the flood control and disaster alleviation suggestions as reviewing the guarantee discharge and improving the standard for the flood control.关键词
“11.9”洪水/洪水特性/河道影响/渭河下游Key words
flood in September 2011/ flood characteristic/ river channel influence/ down stream of Weihe River分类
建筑与水利引用本文复制引用
石长伟,杨宁,陈乃联,包岁利,薛亚莉..渭河“11·9”洪水特性及其河道影响分析[J].水资源与水工程学报,2012,23(4):138-140,144,4.基金项目
水利部公益性行业专项经费项目(201001059) (201001059)
陕西省重点实验室灾害监测与机理模拟实验室项目(2010JS073)资助 (2010JS073)