| 注册
首页|期刊导航|水资源与水工程学报|石膏山水库拱坝应力计算和稳定分析

石膏山水库拱坝应力计算和稳定分析

梁桂萍

水资源与水工程学报2012,Vol.23Issue(4):154-157,4.
水资源与水工程学报2012,Vol.23Issue(4):154-157,4.

石膏山水库拱坝应力计算和稳定分析

Stress calculation and stability analysis of arch dam at Shigaoshan reservoir

梁桂萍1

作者信息

  • 1. 山西省水利水电勘测设计研究院,山西太原030024
  • 折叠

摘要

Abstract

Based on arch-cantilever method and 3 D finite element method, the stress of Shigaoshan concrete arch dam was analyzed under 5 conditions. According to the calculation results, the dam body is divided into 3 zones on the basis of closing arch for grouting: the dam body under the elevation of 1119. 0m is zone 1, the joint closure temperature is 14. 3℃ ; the elevation of the dam body between 1119. 0 tol 130.0 meters was zone 2, the joint closure temperature is 12℃ ; the dam body above the elevation 1130. 0m is zone 3 , the joint closure temperature is 6. 5℃.

关键词

单曲拱坝/应力计算/稳定分析/拱梁分载法/有限元法

Key words

single curvature arch dam/ stress calculation/ stability analysis/ the arch-cantilever method/ finite element method

分类

建筑与水利

引用本文复制引用

梁桂萍..石膏山水库拱坝应力计算和稳定分析[J].水资源与水工程学报,2012,23(4):154-157,4.

水资源与水工程学报

OACSTPCD

1672-643X

访问量0
|
下载量0
段落导航相关论文