| 注册
首页|期刊导航|岩土工程学报|隧道含水构造直流电阻率法超前探测三维反演成像

隧道含水构造直流电阻率法超前探测三维反演成像

刘斌 李术才 聂利超 王静 宋杰 刘征宇

岩土工程学报2012,Vol.34Issue(10):1866-1876,11.
岩土工程学报2012,Vol.34Issue(10):1866-1876,11.

隧道含水构造直流电阻率法超前探测三维反演成像

Advanced detection of water-bearing geological structures in tunnels using 3D DC resistivity inversion tomography method

刘斌 1李术才 1聂利超 1王静 2宋杰 1刘征宇1

作者信息

  • 1. 山东大学岩土与结构工程研究中心,山东济南250061
  • 2. 山东大学控制科学与工程学院,山东济南250061
  • 折叠

摘要

Abstract

The water inrush hazards have become one of the major threats in tunnel construction, and the 3D localization of water inrush hazard sources (water-bearing structure) in front of the tunnel face has become a key problem to be solved urgently. For the above problem, the method of direct current (DC) resistivity 3D inversion tomography advanced detection is proposed. Firstly, 3D whole space stereoscopic observation mode of DC resistivity advanced detection is established. Due to serious flanking interference near survey line, an interference recognition and removal method is proposed, which realizes the measurement of 3D effective information in front of the tunnel face. By analyzing the advantages of linear and nonlinear inversion methods, a joint inversion tomography method which combines the improved genetic algorithms (GA) and the least-squares method is proposed. By use of this method, the dependence on the initial model is eliminated, while the efficiency of inversion is guaranteed. Then, numerical experiments for inversion tomography focusing on the faults, fractures and karst caves and other typical water-bearing structures are carried out systematically. And, the 3D tomography characteristics and geological interpretation criterion about typical water-bearing structures are analyzed and gained. An inversion map from observed data to 3D tomography and then to geological model is realized. Finally, the proposed method is applied in model tests and practical projects. Accurate 3D localization about water-bearing structures is realized, and it proves that this method has good application prospect.

关键词

隧道超前地质预报/含水构造/直流电阻率法/三维反演成像/混合反演方法/旁侧干扰去除

Key words

advanced tunnel geological detection/water-bearing structure/direct current electrical resistivity method/3D inversion tomography/joint inversion method/flanking interference removal

分类

矿业与冶金

引用本文复制引用

刘斌,李术才,聂利超,王静,宋杰,刘征宇..隧道含水构造直流电阻率法超前探测三维反演成像[J].岩土工程学报,2012,34(10):1866-1876,11.

基金项目

国家自然科学基金重点项目 ()

国家自然科学基金青年项目 ()

山东省自然科学基金项目 ()

中国博士后科学基金项目 ()

高等学校博士点学科专项科研基金项目 ()

岩土工程学报

OA北大核心CSCDCSTPCD

1000-4548

访问量0
|
下载量0
段落导航相关论文