摘要

Abstract

In some severe accident scenarios of AP1000 nuclear power plant, a breach or bypass of the containment will lead to large release to environment, which causes severe radioactive pollution of environment. Three release categories (bypass, early containment failure and containment isolation failure) have the largest contribution to large release frequency. Three typical severe accidents (steam generator tube rupture, spuriously open of automatic depressurization system valves and reactor pressure vessel rupture) were selected as typical cases corresponding to the three release categories and the fission-product source terms released to environment were calculated using MAAP code. The analysis results are provided as essential input data for quantifying the release of AP1000 nuclear power plant and the offsite dose analysis.

关键词

AP1000/大量放射性释放/严重事故/源项

Key words

AP1000/ large release/ severe accident/ source term

分类

能源科技

引用本文复制引用

张琨..AP1000核电厂大量放射性释放源项分析[J].原子能科学技术,2012,46(9):1107-1111,5.

原子能科学技术

OA北大核心CSCDCSTPCD

1000-6931

访问量0
|
下载量0
段落导航相关论文