时间错位限制下最小化总完工时间的继列分批重新排序
Series Batching Rescheduling to Minimize Total Completion under a Limit Time Disruption
摘要
Abstract
The total completion time under the limit on the time disruption for series batching rescheduling was considered. The properties of feasible schedule and optimal schedule were studied, and the pseudo-polynomial time algorithms to the difference cases were given out.关键词
重新排序/单机/分批/分批排序/时间错位Key words
rescheduling/ single machine/ batching/ batching sequence/ time disruption分类