哈尔滨地铁利用既有隧道扩挖区间技术

刘效永

湖南工业大学学报2012,Vol.26Issue(3):39-43,5.
湖南工业大学学报2012,Vol.26Issue(3):39-43,5.

哈尔滨地铁利用既有隧道扩挖区间技术

The Technology of Extending the Existing Tunnels to Construct Harbin Metro

刘效永1

作者信息

  • 1. 中铁二十二局集团,北京100043
  • 折叠

摘要

Abstract

Harbin Metro from West Bridge to Jiaohua Square and Jiaohua Square to the railway bureau is constructed by extending the existing civil air defense engineering.Aiming at its structural-broken security problems,the structure internal force variations for first breaking and after breaking are studied.By means of appropriately selecting the first-breaking point and breaking direction,interim vertical pre-support enforcing from sidewall to arch invert as well as vertical grouting and interval digging expanding,the structure internal force variations are within controllable range,and the vault settlement,arch invert floating and ground movement are effectively controlled.The structure and constructing security and the smooth project process are ensured.

关键词

既有人防隧道/跳槽扩挖/首破点/径向注浆/临时竖撑

Key words

existing aerial defense tunnel/interval digging expanding/first-breaking point/vertical grouting/interim vertical support

分类

交通工程

引用本文复制引用

刘效永..哈尔滨地铁利用既有隧道扩挖区间技术[J].湖南工业大学学报,2012,26(3):39-43,5.