树枝形专用线直达车流取送问题优化研究

刘伟达 陈崇双 王慈光

交通运输工程与信息学报2012,Vol.10Issue(4):89-93,115,6.
交通运输工程与信息学报2012,Vol.10Issue(4):89-93,115,6.

树枝形专用线直达车流取送问题优化研究

Optimization Research on Taking-out and Placing-in Shunting Problems of Wagon Flows for Tree-shaped Special Lines

刘伟达 1陈崇双 2王慈光2

作者信息

  • 1. 北京铁路局双桥站,北京100023
  • 2. 西南交通大学交通运输与物流学院,成都610031
  • 折叠

摘要

Abstract

It has important meaning for improving the transportation efficiency and expediting the vehicle turnover to reasonably arrange the sequence of taking-out and placing-in shunting in the area organizing direct-connection transportation train. As the special lines were a tree-shaped system and the wagon flows were not loaded as a whole, this paper took the least total stay problem ch scheme. Th time of a vehicle as the optimization goal, designed the schemes according to the aracteristics and used the implicit enumeration method to search out the optimum en, an example was used to verify its availability and effectiveness.

关键词

路企直通列车/树枝形专用线/取送车/隐枚举算法

Key words

Direct-connection transportation train/tree/shaped special lines/taking-out and placing-in shunting/implicit enumeration method