| 注册
首页|期刊导航|宁夏电力|宁夏电网同塔双回线路零序环流问题仿真分析

宁夏电网同塔双回线路零序环流问题仿真分析

张爽 刘宝柱 田蓓 黄永宁

宁夏电力Issue(5):11-15,44,6.
宁夏电力Issue(5):11-15,44,6.

宁夏电网同塔双回线路零序环流问题仿真分析

Simulation analysis on the problem of zero sequence circular current in the same tower double circuit transmission lines in Ningxia Power Grid.

张爽 1刘宝柱 2田蓓 1黄永宁1

作者信息

  • 1. 宁夏电力科学研究院,宁夏银川750011
  • 2. 华北电力大学,北京100000
  • 折叠

摘要

Abstract

In order to solve the problem of zero sequence circular current in the same tower double circuit transmission lines in Ningxia Power Grid, adopts the whole digital real time simulation method to make simulation analysis. The results show that the size of zero sequence circular current is related to the layout mode of the phase sequence inside the Same tower double circuit untransposed transmission lines, through changing phase layout can reduce the amplitude value of zero sequence circular current.

关键词

宁夏电网/零序环流/仿真

Key words

Ningxia Power Grid/zero sequence circular current/simulation

分类

信息技术与安全科学

引用本文复制引用

张爽,刘宝柱,田蓓,黄永宁..宁夏电网同塔双回线路零序环流问题仿真分析[J].宁夏电力,2012,(5):11-15,44,6.

宁夏电力

1672-3643

访问量0
|
下载量0
段落导航相关论文