| 注册
首页|期刊导航|起重运输机械|台车式浮式起重机旋转平衡系统的预装配和安装工艺

台车式浮式起重机旋转平衡系统的预装配和安装工艺

张国中 刘家员 吴志星 高指林

起重运输机械Issue(10):111-113,3.
起重运输机械Issue(10):111-113,3.

台车式浮式起重机旋转平衡系统的预装配和安装工艺

Pre-assembly and installation of bogie-type rotation balance system of floating crane

张国中 1刘家员 1吴志星 1高指林1

作者信息

  • 1. 海洋石油工程股份有限公司,天津300452
  • 折叠

摘要

Abstract

The paper presents the classification of rotation systems for full slewing floating crane, and then the structure of bogie-type rotation system, plant pre-assemble and ship installation with the first deep-water hoisting pipe-laying vessel HYSY201 in Asia as an example. During pre-assembly and installation process, full consideration for the manufacturing situation of other components of the floating cranes shall be taken to ensure the project goes on smoothly.

关键词

台车式浮式起重机/旋转平衡系统/预装配/安装

Key words

bogie-type floating crane/ rotation balance system/ pre-assembly/ installation

分类

交通工程

引用本文复制引用

张国中,刘家员,吴志星,高指林..台车式浮式起重机旋转平衡系统的预装配和安装工艺[J].起重运输机械,2012,(10):111-113,3.

起重运输机械

OACSTPCD

1001-0785

访问量0
|
下载量0
段落导航相关论文