阿海水电站工程建设设计管理实践与探讨

李章浩 唐世来

水力发电2012,Vol.38Issue(11):28-30,3.
水力发电2012,Vol.38Issue(11):28-30,3.

阿海水电站工程建设设计管理实践与探讨

Practice and Discussion on Design Management of Ahai Hydropower Station Project

李章浩 1唐世来1

作者信息

  • 1. 云南金沙江中游水电开发有限公司,云南昆明650228
  • 折叠

摘要

Abstract

The main purpose of design management is that the design can meet the requirements of project construction by scientific and effective management ways. Because of the tight design duration, the concepts, methods and systems of design management suitable for Ahai hydropower Station Project are explored. The design quality, progress and site technical services meet the requirements of overall project construction progress by taking effective coordination and evaluation mechanism, and it reflects the role of design being the leading. The progress matching of design and construction is guaranteed through the timely review and decision-making of technical solutions. According to the actual situation, the design optimizations are also conducted to save investment.

关键词

设计管理/建设/内容/体系/阿海水电站

Key words

design management/construction/content/system/Ahai Hydropower Station

分类

管理科学

引用本文复制引用

李章浩,唐世来..阿海水电站工程建设设计管理实践与探讨[J].水力发电,2012,38(11):28-30,3.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文