| 注册
首页|期刊导航|水力发电|阿海水电站工程施工总布置综述

阿海水电站工程施工总布置综述

李宏祥 杨燕峡 饶建勇 郭必文

水力发电2012,Vol.38Issue(11):38-41,4.
水力发电2012,Vol.38Issue(11):38-41,4.

阿海水电站工程施工总布置综述

General Construction Layout of Ahai Hydropower Station Project

李宏祥 1杨燕峡 1饶建勇 1郭必文1

作者信息

  • 1. 中国水电顾问集团昆明勘测设计研究院,云南 昆明650051
  • 折叠

摘要

Abstract

In the design of general construction layout of Ahai Hydropower Station, the transportation planning is more appropriate, the arrangement of construction site is reasonable, the arrangement of large 梥cale production facilities are optimized and the arrangement and capacity selection of residue field are suitable. The scope of land acquisition do not change during construction period, and only the position of oil storage tanks is adjusted according to the change of project site conditions. The general construction layout is adapted to the actual situation of project.

关键词

施工总布置/交通运输/料源规划/渣场规划/阿海水电站

Key words

general construction layout/transportation/material resource planning/residue field planning/Ahai Hydropower Station

分类

建筑与水利

引用本文复制引用

李宏祥,杨燕峡,饶建勇,郭必文..阿海水电站工程施工总布置综述[J].水力发电,2012,38(11):38-41,4.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文