阿海水电站大坝混凝土施工方案优化

赵正平

水力发电2012,Vol.38Issue(11):56-58,3.
水力发电2012,Vol.38Issue(11):56-58,3.

阿海水电站大坝混凝土施工方案优化

Optimization on Dam Concrete Construction Scheme of Ahai Hydropower Station

赵正平1

作者信息

  • 1. 中国水利水电第三工程局有限公司,陕西西安710016
  • 折叠

摘要

Abstract

As limited by a variety of factors, the dam construction of Ahai Hydropower Station in earlier stage is lagged more than 2 months. For achieving the goal of reservoir impoundment in December 2012, some optimized measures are taken in concrete construction of dam. These optimizations have effectively accelerated the construction, and guarantee the quality. The adoption of dump trucks to directly dump roller梒ompacted concrete on pouring surface is the key to ensure construction progress and quality.

关键词

大坝混凝土/施工/方案优化/施工进度/阿海水电站

Key words

dam concrete/construction/scheme optimization/construction progress/Ahai Hydropower Station

分类

建筑与水利

引用本文复制引用

赵正平..阿海水电站大坝混凝土施工方案优化[J].水力发电,2012,38(11):56-58,3.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文