煤层气U型井PE筛管完井泵送方案

申瑞臣 时文 徐义 王开龙 蓝海峰

中国石油大学学报(自然科学版)2012,Vol.36Issue(5):96-99,104,5.
中国石油大学学报(自然科学版)2012,Vol.36Issue(5):96-99,104,5.DOI:10.3969/j.issn.1673-5005.2012.05.017

煤层气U型井PE筛管完井泵送方案

PE screen completion for U-shaped coal-bed methane wells with pumping method

申瑞臣 1时文 2徐义 1王开龙 2蓝海峰2

作者信息

  • 1. 中国石油勘探开发研究院研究生部,北京100083
  • 2. 中国石油集团钻井工程技术研究院,北京100195
  • 折叠

摘要

Abstract

In the U-shaped and multi-branched coal-bed methane (CBM) wells, sloughing which is likely to result in flow path blocking up, is one of the main limiting factors for CBM production. PE screen completion is a kind of method to resolve the problem. PE screen can support the well hole effectively, and reduce the damage caused by sloughing. PE screen is injected from the surface through pipes. With pushing force in one end and friction in the other end, buckling will occur when certain length of the PE screen injected. Pumping can relieve the buckling and lead the screen to preset position. The shape and size of pressure-bearing shoulder which is located at the front end of PE screen guiding unit are key factors for the pumping effect. With simplified model, the formula of fluid impact force was deduced. The method for obtaining coefficient of resistance was analyzed using field test, and the effect of pumping method was testified. The results show that the impact force is in proportion to the square of differential velocity between the drilling fluid and the PE screen guiding unit. The resistance coefficient is determined by the fit clearance between the shoulder and inner wall of the pipes.

关键词

煤层气/筛管完井/泵冲/流阻系数

Key words

coal-bed methane/ screen completion/ pumping/ resistance coefficient

分类

能源科技

引用本文复制引用

申瑞臣,时文,徐义,王开龙,蓝海峰..煤层气U型井PE筛管完井泵送方案[J].中国石油大学学报(自然科学版),2012,36(5):96-99,104,5.

基金项目

国家科技重大专项(201105037-001) (201105037-001)

中国石油大学学报(自然科学版)

OA北大核心CSCDCSTPCD

1673-5005

访问量0
|
下载量0
段落导航相关论文