城市既有跨线桥改造设计及施工方案浅析

李佳

铁道标准设计Issue(11):65-68,4.
铁道标准设计Issue(11):65-68,4.

城市既有跨线桥改造设计及施工方案浅析

Analysis on Design and Construction Scheme of Renovation Project of Existing Urban Overpass Bridge

李佳1

作者信息

  • 1. 中铁工程设计咨询集团有限公司郑州设计院,郑州450001
  • 折叠

摘要

Abstract

The design and construction is always complicated in the renovation project of the existing urban overpass bridge under the premise of ensuring both the safe railway operation and unimpeded urban traffic. Aiming at the multiple design control factors, narrow constructing site, urgent time limit and other restrictions, the secure and reasonable scheme has been made for the renovation project of Heyibei Overpass Bridge (Gaoyang Bridge) between highway and railway in Zhengzhou city. In the renovation scheme, the existing "U" shaped abutment was kept as the retaining wall for the new abutment in order to avoid the heavy excavation, and then the newly-buried abutment was built behind it. In order to make sure that the new railway clearance isn't below the existing clearance under the bridge, the pre-stressed-concrete hallow slab beam with small height and the large hinge joints are adopted. During the construction, cooperated with the crane, the equipment which can move the beam across the railway line is used to dismantle the existing "T" shaped beam and then erect a new beam. That can reduce the working time of operation above the railway track to the minimum value so as to ensure the operation safety of electrified railway and shorten the total construction period.

关键词

公铁立交桥/危桥/改造方案

Key words

overpass bridge between highway and railway/ dangerous bridge/ renovation scheme

分类

交通工程

引用本文复制引用

李佳..城市既有跨线桥改造设计及施工方案浅析[J].铁道标准设计,2012,(11):65-68,4.

铁道标准设计

OA北大核心CSTPCD

1004-2954

访问量2
|
下载量0
段落导航相关论文