| 注册
首页|期刊导航|铁道标准设计|城市轨道交通信号系统初期开通方案浅析

城市轨道交通信号系统初期开通方案浅析

甘勇 彭传贤 卢小军

铁道标准设计Issue(11):110-113,4.
铁道标准设计Issue(11):110-113,4.

城市轨道交通信号系统初期开通方案浅析

Analysis on Initial Opening Scheme of Signal System of Urban Rail Transit

甘勇 1彭传贤 1卢小军1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司通信信号设计研究处,武汉430063
  • 折叠

摘要

Abstract

As a key system in the electromechanical systems of urban rail transit, the signal system's initial opening scheme will cause significant influences upon the operation of urban rail transit. In the thesis, the initial opening scheme of the signal system is expounded from the downgraded mode and the transitional mode, then the specific implementation ways are described, finally comparative analysis is made about functions, implementation conditions and ways, advantages and disadvantages of opening schemes, which offers references for confirming the initial opening scheme in future. The thesis thinks that; when the opening is of a long cycle and the operations are less demanded, we may choose the downgraded mode; when the opening time is urgent, we may choose the transitional one.

关键词

城市轨道/信号系统/开通方案/研究

Key words

urban rail transit/ signalling system/ opening scheme/ research

分类

交通工程

引用本文复制引用

甘勇,彭传贤,卢小军..城市轨道交通信号系统初期开通方案浅析[J].铁道标准设计,2012,(11):110-113,4.

铁道标准设计

OA北大核心CSTPCD

1004-2954

访问量0
|
下载量0
段落导航相关论文