北京交通大学学报2012,Vol.36Issue(6):8-14,20,8.
面向我国铁路实际的动车组运用计划编制问题
Train-set scheduling problem geared to practical production process of railway in China
摘要
Abstract
This paper explains the connotations of the train-set operation issue from both broad sense and narrow sense, and points out that the connotation from narrow sense with the train-set scheduling problem at its core is the current focus of concern. First, the current situations of several influencing factors of train-set routing schedule are illustrated, in terms of the train-set product series, train operation characteristics, train-set maintenance system and management system in China. Then, the process of train-set scheduling is divided into circulation planning and maintenance routing stages, and the constraints and evaluation indices of both stages are analyzed from the practical production demands of railway in China. Finally, several key points of the train-set scheduling problem are proposed to support the related studies in the future.关键词
动车组/运用计划/约束条件/评价指标/研究展望Key words
train-set/ routing schedule/ constraint/ evaluation index/ research prospect分类
交通工程引用本文复制引用
李华,韩宝明,赵鹏..面向我国铁路实际的动车组运用计划编制问题[J].北京交通大学学报,2012,36(6):8-14,20,8.基金项目
国家科技支撑计划项目资助(2009BAG12A10) (2009BAG12A10)
中央高校基本科研业务费专项资金项目资助(2009YJS041) (2009YJS041)