黑龙江科技学院学报2012,Vol.22Issue(6):577-580,4.
断层破碎带巷修注浆加固技术
Grouting reinforcement technology for mine roadway repair in fault fracture zone
兰永伟 1李凤义2
作者信息
- 1. 东北大学资源与土木工程学院,沈阳110819 黑龙江省煤矿深部开采地压控制与瓦斯治理重点实验室(黑龙江科技学院),哈尔滨150027
- 2. 黑龙江省煤矿深部开采地压控制与瓦斯治理重点实验室(黑龙江科技学院),哈尔滨150027
- 折叠
摘要
Abstract
Aimed at improving mine roadway repair in fault fracture zone,this paper,building on grouting reinforcement theory and the experiments of grouting material ratio,presents an analysis of the relation between the geling time and cement-water-glass in different volume ratio conditions,and an analysis of the relation between the compressive strength and cement-water-glass in different volume ratio conditions.The paper features the best volume ratio of cement-water glass of 1:0.4 for grouting reinforcement,offers the mine roadway repair scheme tailored to the grouting reinforcement by combining U-shaped shed with shotcrete according to the practical conditions,and provides a better solution to on-site problems.The research has reference to repairing similar mine roadway with fault fracture zones.关键词
断层/破碎带/巷道维修/注浆加固Key words
fault/fracture zone/mine roadway repair/grouting reinforcement分类
矿业与冶金引用本文复制引用
兰永伟,李凤义..断层破碎带巷修注浆加固技术[J].黑龙江科技学院学报,2012,22(6):577-580,4.