摘要

Abstract

Based on geological characteristics of the weak and cracked rock mass surrounding around Zhongtiaoshan tunnel, finite difference software was used to simulate the excavation process of bench method and centre-diaphragm method respectively. The deformation of surrounding rock (vault crown settlement and horizontal convergence displacement) and the stress of preliminary support system (first lining and bolt) under different excavation methods were compared. The results show that when the upper portion of the bench passes by, both deformation of surrounding rock and stress of prelimi- nary support are relatively large, centre-diaphragm method is better at controlling the surrounding rock displacement, but the advantage is not obvious for tunnels crossing weak and cracked rock mass, bench method is better than centre-diaphragm method in controlling the stress of preliminary support system.

关键词

隧道/软弱破碎围岩/台阶法/单侧壁导坑法/初期支护

Key words

tunnels/weak and cracked strata/bench method/centre-diaphragm method/preliminarysupport

分类

交通工程

引用本文复制引用

崔岚,郑俊杰,章荣军,余舜..软弱破碎带隧道围岩变形及初期支护受力分析[J].华中科技大学学报:自然科学版,2012,40(11):53-57,5.

基金项目

山西省交通厅科技建设项目 ()

华中科技大学学报:自然科学版

OA北大核心CSCDCSTPCD

1671-4512

访问量2
|
下载量0
段落导航相关论文