大型深基坑开挖的有限元分析

郑军 余绍锋

结构工程师2012,Vol.28Issue(5):124-127,4.
结构工程师2012,Vol.28Issue(5):124-127,4.

大型深基坑开挖的有限元分析

Finite Element Analysis of Deep Excavations

郑军 1余绍锋2

作者信息

  • 1. 中铁十二局集团建筑安装工程有限公司,太原030024
  • 2. 同济大学土木工程学院建筑工程系,上海200092
  • 折叠

摘要

Abstract

The excavation for deep foundation pits of Ji'nan West Railway Station and its auxiliary projects were studied in this paper. Based on the construction project of foundation pit, a mechanic model for excavation was firstly proposed. Then the Mohr-Coulomb model was used to simulate the elastoplastic property of soil by site investigations and soil test datas. The ABAQUS software was used to analyse the process of stepped excavation for the foundation pit. The results show the rules of force and deformation of complicated deep excavations. Finally, some numerical examples were given.

关键词

深基坑/莫尔-库仑模型/分步开挖/有限元分析

Key words

deep foundation pit, Mohr-Coulomb model, stepped excavation, finite element analysis

引用本文复制引用

郑军,余绍锋..大型深基坑开挖的有限元分析[J].结构工程师,2012,28(5):124-127,4.

结构工程师

OA北大核心CSTPCD

1005-0159

访问量0
|
下载量0
段落导航相关论文