大采高采煤机挡矸装置的改进设计

李赫 张啸 张丽明 闫鹏飞

工矿自动化2012,Vol.38Issue(11):101-103,3.
工矿自动化2012,Vol.38Issue(11):101-103,3.

大采高采煤机挡矸装置的改进设计

Improvement Design of Gangue Blocking Device of Shearer with Large Mining Height

李赫 1张啸 1张丽明 1闫鹏飞1

作者信息

  • 1. 太重煤机有限公司技术中心,山西太原030032
  • 折叠

摘要

Abstract

The structure, principle, technical characteristics and existed problems of traditional gangue blocking device of shearer with large mining height were analyzed, an improvement design was proposed and simulation analysis was given. By means of increasing cylinder number, strengthening and thickening top guard, changing rigid connection to flexible connection and adding flow dividing and combining valves, dynamic adjustment and bracing of the guard are achieved, and reliability of gangue blocking device and mining efficiency of shearer are both improved. The simulation result shows that the force of the improved gangue blocking device is more even, and the guard can withstand greater force.

关键词

大采高采煤机/挡矸装置/油缸数量/顶护板/柔性连接/分流集流阀/动态调节/动态支护

Key words

shearer with large mining height/ gangue blocking device/ cylinder number/ top guard/ flexible connection/ flow dividing and combining valve/ dynamic adjustment/ dynamic bracing

分类

矿业与冶金

引用本文复制引用

李赫,张啸,张丽明,闫鹏飞..大采高采煤机挡矸装置的改进设计[J].工矿自动化,2012,38(11):101-103,3.

基金项目

山西省科技重大专项项目(MG1100/2860-WD电牵引采煤机的研制) (MG1100/2860-WD电牵引采煤机的研制)

工矿自动化

OA北大核心CSTPCD

1671-251X

访问量2
|
下载量0
段落导航相关论文