水利水电技术2012,Vol.43Issue(11):18-20,40,4.
泥沙实体模型试验自动测控系统组建及应用
Establishment and application of automatic monitoring and control system for sediment physical model test
摘要
Abstract
In order to enhance the control accuracy and decrease the relevant the impacts from human factors during the sediment physical model test, a set of automatic monitoring and control system that includes the automatic control of the intake runoff-sediment process, automatic monitoring of testing parameters and automatic control of outlet flow is established with advanced equipment , which is already applied to several sediment physical model tests successfully. The system is introduced herein based on its actual application to the physical model test for the Study on The River Pattern Transformation Mechanism.关键词
泥沙实体模型试验/自动控制/自动测量/实时显示Key words
sediment physical model tests/automatic control/automatic measurement/real-time display分类
建筑与水利引用本文复制引用
董占地,吉祖稳,胡海华,王党伟..泥沙实体模型试验自动测控系统组建及应用[J].水利水电技术,2012,43(11):18-20,40,4.基金项目
中国水利水电科学研究院科研专项经费(泥集1130) (泥集1130)
水利部公益行业科研专项经费(200701003). (200701003)