水资源与水工程学报2012,Vol.23Issue(5):142-144,147,4.
无资料的青海省乐都县大沟断面设计洪峰流量分析
Design peak flow analysis of big groove section without information in Ledu County
王克祯 1赵毅邦 1裴生山1
作者信息
- 1. 青海省水文水资源勘测局,青海西宁810000
- 折叠
摘要
Abstract
To protect the proposed aluminum plant itself and the local peopled lives and property safety in Ledu County, Qinghai Province, hydrological calculation and analysis of design section at the big groove are carried out by using a variety of methods. Design peak flow results obtained at different frequencies can provide a scientific basis for reasonably choosing site, formulating flood control planning, and so on.关键词
洪峰流量/设计洪峰流量/水文计算/大沟断面/乐都县Key words
peak flow/ design peak flow/ hydrological calculation/ Dagou section/ Ledu county分类
建筑与水利引用本文复制引用
王克祯,赵毅邦,裴生山..无资料的青海省乐都县大沟断面设计洪峰流量分析[J].水资源与水工程学报,2012,23(5):142-144,147,4.