岩土力学2013,Vol.34Issue(1):235-242,8.
超大直径土压平衡盾构施工对环境影响的现场监测研究
Measurement and analysis of ground settlement due to EPB shield construction
摘要
Abstract
Controlling the impact on the environment is the key point for the earth pressure balance (EPB) shield construction. Based on the Yingbinsanlu tunnel project constructed by the Φ14.27 m earth pressure balance shield in Shanghai, field measurement is executed to study the development and distribution of the ground settlement and the relationship between the ground settlement and construction parameters. According to analyzing the measured data, it could be found that the underlying law of the ground settlement development is determined by the chamber pressure and synchronization grouting parameters. Bad filling effect of the synchronization grouting may lead to obvious development of ground surface settlement in a large region and the settlement rate of ground surface above the shield tail is maximum. Good filling effect of the synchronization grouting could effectively control the ground surface settlement. The Peck formula is suitable for the bad filling condition. In addition, measured data reveal that pore pressure would dissipate which leads to the gradually development of the ground surface settlement; and the settlement rate of ground surface above the shield tail is maximum during a long-time standstill of the EPB shield.关键词
超大直径土压平衡盾构/地表沉降/施工参数/盾构停推Key words
super-diameter EPB shield/ ground settlement/ construction parameters/ shield standstill分类
建筑与水利引用本文复制引用
侯永茂,郑宜枫,杨国祥,葛修润,邱裕华..超大直径土压平衡盾构施工对环境影响的现场监测研究[J].岩土力学,2013,34(1):235-242,8.基金项目
上海市博士后基金项目资助(No.11r21421200). (No.11r21421200)